Use of MOP sets
Posted: Sat Mar 10, 2012 11:37 am
I have standard 6.0 Visualmill for Solidworks.
I put my operations under Mop Set 1. I see that I can create a Mop Set 2 under these operations.
1) How is this feature used? If I have 2 setups for one parts, can I use Mop Set 2 as the second setup? Will the mill pause after Mop Set 1?
2) Is the a way to cut and paste operations from one part to another part?
Thanks,
John
I put my operations under Mop Set 1. I see that I can create a Mop Set 2 under these operations.
1) How is this feature used? If I have 2 setups for one parts, can I use Mop Set 2 as the second setup? Will the mill pause after Mop Set 1?
2) Is the a way to cut and paste operations from one part to another part?
Thanks,
John