I have a part that requires 2 drilling operations in sequence prior to a 2-1/2D profile.
I have two seperate standard drilling operations and a different drill chosen for each operation. The drill for the first drilling operation is .156 and the drill for the second operation is a .062 drill. When I post I don't get a tool change? What am I doing wrong???
Any assistance appreciated!!!
HELP - TOOL CHANGE
-
- Posts: 18
- Joined: Wed May 21, 2008 8:02 am
- Contact:
HELP - TOOL CHANGE
Jack Mc Kie
www.freshwatermodels.net
www.freshwatermodels.net
-
- Posts: 488
- Joined: Wed Aug 01, 2007 4:15 pm
- Location: Switzerland
- Contact:
-
- Posts: 18
- Joined: Wed May 21, 2008 8:02 am
- Contact:
Mitch,
Got a tool change! Thanks! Couldn't see the one tree from the forest. I'll pay attention to that one now!
Have a great day!!!
Jack
Got a tool change! Thanks! Couldn't see the one tree from the forest. I'll pay attention to that one now!
Have a great day!!!
Jack
Jack Mc Kie
www.freshwatermodels.net
www.freshwatermodels.net